Chibuluma Mines Plc

Chibuluma

ACTIVE

The project is located in Kalulushi about 22 km west of Kitwe. Its ore bodies includes Chibuluma South (main currently active), previously Chibuluma East and West (now depleted), and the newer Chifupu extension (portal mining inaugurated in 2013). The company is located in Lufwanyama District. Metorex Limited - originally a South African the owned and operated the mine from 1997. In 2011 Jinchuan Group, a Chinese state-owned enterprise, launched a US $1.1 billion takeover bid for Metorex, aiming to acquire all of its assets, including Chibuluma Mine.

Country

Zambia

Province

Copperbelt Province

Start Date

2013

Minerals
cobaltcopper

Annual Production

YearStatusBauxiteCopperCobaltLithiumTantalum
2022operational-----

Mining Details

Mining TypeUnderground
Permit ValidityND
Coordinates-12.8311°, 28.1053°

The project is located in Kalulushi about 22 km west of Kitwe. Its ore bodies includes Chibuluma South (main currently active), previously Chibuluma East and West (now depleted), and the newer Chifupu extension (portal mining inaugurated in 2013). The company is located in Lufwanyama District. Metorex Limited - originally a South African the owned and operated the mine from 1997. In 2011 Jinchuan Group, a Chinese state-owned enterprise, launched a US $1.1 billion takeover bid for Metorex, aiming to acquire all of its assets, including Chibuluma Mine.

Ownership

Jinchuan Group (via its subsidiary called Metorex)
85%
Zambia Consolidated Copper Mines Investments Holdings
15%

Deposit Size

Total Ore

-

45 Mt along 300 m strike, dipping 40° to 600 m depth for Chibuluma South, while Chifupu Extension has 3.1 Mt at 2% Cu (1.35 Mt mineable @ 1.8% Cu).

Project Impacts

Social Impacts

42 families were also relocated

resolved

Meaning: 42 families were also relocated

42 families were also relocated by the ZCCM after having been affected by the pollution from the tailing's dams

Year: 2023Countries: ZambiaRelated: Chibuluma Mines Plc

Environmental Impacts

There were cases of pollution reported

resolved

Meaning: There were cases of pollution reported in which 42 families

There were cases of pollution reported in which 42 families were affected by dust particles from copper productions and affected by tailings dams. It was discovered that the communities sustained healthy and respiratory problems

Year: 2023Countries: ZambiaRelated: Chibuluma Mines Plc

Related Reports1

Related News1