Sino-Congolaise des mines

SICOMINES

ACTIVE

In April 2008, the joint venture was established under the name Sicomines, adopting the form of a limited liability company. In April 2010, a feasibility study was conducted by the China Enfi Engineering Corp., which estimated the mineral reserves at 8,544,900 tonnes of copper and 571,800 tonnes of cobalt. In 2014, Sicomines Sarl was transformed into a public limited company following the application of Organisation for the Harmonisation of Business Law in Africa (OHADA) standards by the Democratic Republic of Congo (DRC). Construction of the mine was completed in 2015 and the company began production in October 2015. The following year, 2016, was its first year of full production.

Country

DRC

Province

Lualaba

Start Date

2008

Minerals
cobaltcopper

Annual Production

YearStatusBauxiteCopperCobaltLithiumTantalum
2022operational-257,836.32,418.46--

Mining Details

Mining TypeOpen Pit
Area (Hectares)1,104.41
Mining Squares13
Permit ValidityLicence valid until 03/04/2024.
Coordinates-10.7333°, 25.3708°

Sicomines is located between the commune of Dilala, city of Kolwezi, and the village of Mutaka, groupement Kazembe, Luilu sector, Mutshatsha territory, about five kilometers from the city of Kolwezi.

Ownership

China Railway
68%
Sinohydro
68%
Gécamines
32%

Deposit Size

Total Ore

250 million tonnes

Grade

3.22% Cu and 0.192% Co

Ore reserves are estimated at 250 million tonnes, with copper at 3.22% and cobalt at 0.192%.